Revolution Slider Error: The param Slider Width should not be empty.
Very High Standards

You won’t find any “Sherwin-Williams Rebuilds” here (no offense to the folks at Sherwin-Williams.) But we take re-manufacturing of our pumps very serious. Our techs follow strict guidelines — and they know every pump needs to meet, or exceed, original factory performance and quality specifications before they can stamp it “Done.”

Learn a little more about our process:

  • Seals, Bearings, Gaskets etc. Always Replaced
  • Rebuilt to Factory Clearances & Performance
  • 29-Point Quality Test Checklist
  • 2-Year Full Parts & Labor Warranty

Step 1:
Strip Down & Polish Up

Every pump we bring into our shop to re-manufacture is taken apart piece-by-piece. We throw away all soft and minor parts such as gaskets, seals, bearings etc. Then every individual part is thoroughly cleaned and striped down. During this stage we also treat the parts chemically to minimize the risk of rusting and corrosion — part of our “Better than Factory” Quality Program to add value and take the pump past original factory standards.

  • Tear down every pump to bare parts and metal
  • Throw out gaskets, seals, bearings
  • Clean and chemically treat all non-ferrous metal parts

Step 2:
Find the Rotten Apples

Once we’ve got the parts loose and cleaned thoroughly, our techs go to work very closely inspecting each and every part. They start with a close visual inspection to find any obvious cracks, cavitation and other signs of wear. We throw out many parts at this point. But the real test begins when we whip out our micrometers! Every pump part we put into a rebuild is closely measured to ensure it generously falls within original factory tolerances.

  • Visual inspection finds many obvious worn down parts
  • Techs use precision measurement tools to ensure original factory standards
  • Top quality replacement parts used when necessary
  • Follow factory documentation
  • Technical training standards
  • Model-specific checklist
  • Top quality/tough paint
  • Port covers, wrapping
  • As close to factory as possible
  • 29-Point Evaluation
  • Pressure test PD pumps
  • Dry run? Test operation?